Pratik Mankawde f3a095ab65 docs(telemetry): align Phase 1a plan docs with Phase 1b implementation
Phase-1a plan documents advertised OTLP/gRPC on port 4317 as the default
exporter, four unparsed [telemetry] config keys, and "Phase 4a Complete"
status with exit-criteria checkboxes marked done. Every downstream branch
through Phase 5 ships only OTLP/HTTP on port 4318 via OtlpHttpExporterFactory,
never parses the advertised keys, and the Phase 4 work is not yet delivered.

Fixes:
- 02-design-decisions.md: flip §2.1.1 SDK dependency recommendations to
  OTLP/HTTP (shipped) with OTLP/gRPC marked Future. Update §2.2 architecture
  diagram and text from OTLP/gRPC:4317 to OTLP/HTTP:4318. Rewrite §2.2.1 as
  "OTLP/HTTP (Shipped)" and §2.2.2 as "OTLP/gRPC (Future Work — Planned
  Upgrade)" with a concrete checklist (Conan dep, config parsing, factory
  branch, runbook/dashboard updates) for landing the gRPC transport later.
- 05-configuration-reference.md: drop the fabricated exporter/otlp_grpc key
  and the :4317 default from the sample config block and the options-summary
  table. Move trace_pathfind, trace_txq, trace_validator, trace_amendment
  into a new "Planned (not yet implemented)" table citing the phase that will
  add each one. Keep the example config minimal so copy-paste does not produce
  a silently-ignored stanza.
- 06-implementation-phases.md: reset Phase 4 Exit Criteria checkboxes from
  [x] to [ ] (Phase 4 is not shipped at Phase-1a time). Rename "Phase 4a
  Complete" to "Phase 4a Plan" and describe the work as future. Replace the
  broken forward link to Phase4_taskList.md (introduced in the Phase 2 PR)
  with a sentence pointing readers to where that spec will land. Renumber
  the final section 6.12 to 6.11 so it sits directly after 6.10; section 6.11
  ("Effort Summary") was intentionally removed in earlier edits.