Commit Graph

2 Commits

Author SHA1 Message Date
Pratik Mankawde
702cf63c62 Separate plan from tasks: move Phase 7 plan into 06-implementation-phases.md, remove Phase 8 content
- Move Phase 7 motivation (gains/losses/decision) and architecture (class
  hierarchy, data flow diagram, config) from Phase7_taskList.md into
  06-implementation-phases.md §6.8
- Strip Phase7_taskList.md to tasks only (7.1-7.8 + summary table)
- Remove Phase8_taskList.md — belongs on Phase 8 branch
- Remove §6.8.1 (Phase 8) from 06-implementation-phases.md
- Remove §5a (Phase 8 log correlation) from 09-data-collection-reference.md
- Remove Phase 8 row from OpenTelemetryPlan.md phase table

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-16 16:46:36 +00:00
Pratik Mankawde
85a2220312 Phase 7-8: Plan docs for native OTel metrics migration and log-trace correlation
Phase 7 (native metrics): Replace StatsDCollector with OTelCollectorImpl
behind the existing beast::insight::Collector interface. Maps Counter,
Gauge, Meter, Event to OTel SDK instruments. Exports via OTLP/HTTP to
same collector endpoint as traces. Eliminates StatsD UDP dependency.
Resolves deferred Phase 6 Task 6.1 (|m wire format).

Phase 8 (log correlation): Inject trace_id/span_id into JLOG output
via Logs::format() thread-local span context read. Add Grafana Loki
with OTel Collector filelog receiver for centralized log ingestion.
Enable bidirectional Tempo-Loki correlation in Grafana.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-16 16:46:36 +00:00