Commit Graph

8 Commits

Author SHA1 Message Date
Pratik Mankawde
92d109ce16 docs: add external dashboard parity tasks and metric reference for Phase 9
Add Tasks 9.11-9.13 (Validator Health, Peer Quality, Ledger Economy dashboards),
new metric tables in data-collection-reference, and monitoring sections in runbook
covering validation agreement, validator health, peer quality, and state tracking.

Source: external dashboard parity design spec (2026-03-30).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:40 +01:00
Pratik Mankawde
6738f8b9ab docs: update Phase 9 docs and dashboard for push_metrics.py parity gauges
- Add Task 9.7a to Phase9_taskList.md documenting new gauges
- Add metric tables to 09-data-collection-reference.md (server_info,
  build_info, complete_ledgers, db_metrics, extended cache/nodestore)
- Update metric counts from ~50 to ~68 in 06-implementation-phases.md
- Add OTel MetricsRegistry gauge reference to telemetry-runbook.md
- Add 11 new panels to system-node-health.json Grafana dashboard
  (server state, uptime, peers, validated seq, last close info,
  build version, complete ledgers, db sizes, historical fetch rate,
  peer disconnects)
- Fix leftover merge conflict marker in 08-appendix.md
- Add ripplex/mseconds to cspell dictionary

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:40 +01:00
Pratik Mankawde
43d36ff4f0 Phase 9: Metric gap fill - nodestore, cache, TxQ, load factor dashboards
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:40 +01:00
Pratik Mankawde
6916734eae Phase 8: Log-trace correlation with Loki and filelog receiver
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:40 +01:00
Pratik Mankawde
4137495282 Phase 7: Native OTel metrics migration
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:39 +01:00
Pratik Mankawde
7ad43d4c21 Phase 6: StatsD metrics integration into telemetry pipeline
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:39 +01:00
Pratik Mankawde
753e7721e0 Phase 5b: Ledger, peer, and tx spans with expanded Grafana dashboards
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 16:39:39 +01:00
Pratik Mankawde
c07dd573fe Phase 5: Documentation, deployment configs, integration test infrastructure
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-31 13:50:38 +01:00